Details of Action
−
+
1. Approval of the One Year Plan amendment to LDR (Low Density Residential) and rezoning of this site to RP-1 (Planned Residential) at an appropriate density by the Knoxville City Council.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (City Ord. 0-280-90).
4. Meeting all applicable requirements of the Knoxville Department of Engineering.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of any sinkholes (closed contour area) on this site, as determined by the Tennessee Department of Environment and Conservation. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knoxville Department of Engineering. An engineered footing is required for any structures within the 50' sinkhole buffer.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration or drainage discharge into sinkholes.
7. Certification on the final plat by the applicant's surveyor that there is 300' of sight distance in both directions along Foote Mineral Ln. at the proposed entrance.
8. At final plat approval, record a line of sight easement across Lots 22 and 23 in order to provide the needed sight distance for the curve in Road B.
9. Place a note on the final plat that Lots 1, 37 and 39 will have access only to the internal street system.
10. Meeting all requirements of the approved use on review development plan.
11. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Property Information
−
+
LocationEast side of Foote Mineral Ln., northeast of Bakertown Rd.
Council District 3
Size8.90 acres
Sector
Currently on the Property
Single-family residence
Growth PlanUrban Growth Area (Inside City Limits)
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerKnoxville Utilities Board
TelephoneMetro Group Bell South Telephone
WaterKnoxville Utilities Board
Case Notes
−
+
Staff Recommendation
APPROVE the Concept Plan subject to 11 conditions:
1. Approval of the One Year Plan amendment to LDR (Low Density Residential) and rezoning of this site to RP-1 (Planned Residential) at an appropriate density by the Knoxville City Council.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (City Ord. 0-280-90).
4. Meeting all applicable requirements of the Knoxville Department of Engineering.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of any sinkholes (closed contour area) on this site, as determined by the Tennessee Department of Environment and Conservation. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knoxville Department of Engineering. An engineered footing is required for any structures within the 50' sinkhole buffer.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration or drainage discharge into sinkholes.
7. Certification on the final plat by the applicant's surveyor that there is 300' of sight distance in both directions along Foote Mineral Ln. at the proposed entrance.
8. At final plat approval, record a line of sight easement across Lots 22 and 23 in order to provide the needed sight distance for the curve in Road B.
9. Place a note on the final plat that Lots 1, 37 and 39 will have access only to the internal street system.
10. Meeting all requirements of the approved use on review development plan.
11. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE the Concept Plan subject to 11 conditions:
Details of Action
1. Approval of the One Year Plan amendment to LDR (Low Density Residential) and rezoning of this site to RP-1 (Planned Residential) at an appropriate density by the Knoxville City Council.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (City Ord. 0-280-90).
4. Meeting all applicable requirements of the Knoxville Department of Engineering.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of any sinkholes (closed contour area) on this site, as determined by the Tennessee Department of Environment and Conservation. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knoxville Department of Engineering. An engineered footing is required for any structures within the 50' sinkhole buffer.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration or drainage discharge into sinkholes.
7. Certification on the final plat by the applicant's surveyor that there is 300' of sight distance in both directions along Foote Mineral Ln. at the proposed entrance.
8. At final plat approval, record a line of sight easement across Lots 22 and 23 in order to provide the needed sight distance for the curve in Road B.
9. Place a note on the final plat that Lots 1, 37 and 39 will have access only to the internal street system.
10. Meeting all requirements of the approved use on review development plan.