: Village Of Concord HZ
3-H-04-HZ
Approved
Recommendation
APPROVE. Proposed infill buildings are consistent with each other and with other new buildings in this area and will present a unified design that affirms their construction date, while blending with the historic Village as a whole.Applicant Request
Other:- Construct 8 new houses on 9 lot subdivision, using lots 1, 2, 4-9. Previous approval (File No. 7303CON) includes street widths and street pattern, and tentative approval of elevations, with request that garages be side entry. Lots 1 &7 - two story brick veneer and vinyl siding with one-third front porch with round metal columns, cross gable roof and double hung six over six windows; Lot 2 - one and one-half story side gable roof with lower cross gables, one bay central front porch, gabled dormers, and brick or vinyl siding wall coverings; Lot 4, two story frame with brick and vinyl siding wall covering, full shed roofed front porch, double hung windows; Lots 5 & 9 - two story frame with one story wrap around front and side porch, cross gable roof, brick and vinyl wall covering; Lot 6 - Two story frame with hip roof with lower cross gable, one story two thirds front porch with shed roof and centered gable at entry, paired double hung windows; Lot 8 - Two story frame with brick veneer and vinyl siding wall covering, hip roof with lower telescoping gables, one story shed roofed two thirds front porch and paired and single double hung windows.
- NOTE: House plans may be locatedon different lots within subdivision provided: 1) a final record of their location is supplied to HZC; and 2) duplicate designs are not built on adjoining lots.
- Construct 8 new houses on 9 lot subdivision, using lots 1, 2, 4-9. Previous approval (File No. 7303CON) includes street widths and street pattern, and tentative approval of elevations, with request that garages be side entry. Lots 1 &7 - two story brick veneer and vinyl siding with one-third front porch with round metal columns, cross gable roof and double hung six over six windows; Lot 2 - one and one-half story side gable roof with lower cross gables, one bay central front porch, gabled dormers, and brick or vinyl siding wall coverings; Lot 4, two story frame with brick and vinyl siding wall covering, full shed roofed front porch, double hung windows; Lots 5 & 9 - two story frame with one story wrap around front and side porch, cross gable roof, brick and vinyl wall covering; Lot 6 - Two story frame with hip roof with lower cross gable, one story two thirds front porch with shed roof and centered gable at entry, paired double hung windows; Lot 8 - Two story frame with brick veneer and vinyl siding wall covering, hip roof with lower telescoping gables, one story shed roofed two thirds front porch and paired and single double hung windows.
Village of Concord HZ
- Style: Vacant land.
- New houses as follows: Lots 1 &7 - two story brick veneer and vinyl siding with one-third front porch with round metal columns, cross gable roof and double hung six over six windows; Lot 2 - one and one-half story side gable roof with lower cross gables, one bay central front porch, gabled dormers, and brick or vinyl siding wall coverings; Lot 4, two story frame with brick and vinyl siding wall covering, full shed roofed front porch, double hung windows; Lots 5 & 9 - two story frame with one story wrap around front and side porch, cross gable roof, brick and vinyl wall covering; Lot 6 - Two story frame with hip roof with lower cross gable, one story two thirds front porch with shed roof and centered gable at entry, paired double hung windows; Lot 8 - Two story frame with brick veneer and vinyl siding wall covering, hip roof with lower telescoping gables, one story shed roofed two thirds front porch and paired and single double hung windows.
- Style: Vacant land.
Applicable Guidelines
Village of Concord Design Guidelines, adopted by the Knox County Commission on October 22, 2001.
See GuidelinesMeeting Date
March 18, 2004
COA Expires March 18, 2006
Village of Concord HZ
Amberjack Way
Applicant / Owner
Gary Duncan - Sentinel Builders
Case History
Date Filed
March 4, 2004
Date Heard