Approved
Approve Variances 1-2
APPROVE Final Plat
Approve Variances 1-2
APPROVE Final Plat
1. To reduce the required utility and drainage easement from 10' to 2.7' under the existing storage building along the rear property line as shown on plat.
2. To reduce the required utility and drainage easement from 5' to 4.6' under the existing storage building along the common lot line with Lot 66 as shown on plat.
Commission District 4
Professional Land Systems/Ralph Smith