$_POSTArray
(
)
$_GETArray
(
    [case] => 1-SC-23-C
)
$_SERVERArray
(
    [REDIRECT_HTTPS] => on
    [REDIRECT_UNIQUE_ID] => Zz8sl799RwO749VMC1UnzgAAAAo
    [REDIRECT_PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [REDIRECT_STATUS] => 200
    [HTTPS] => on
    [UNIQUE_ID] => Zz8sl799RwO749VMC1UnzgAAAAo
    [PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [HTTP_USER_AGENT] => Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
    [HTTP_X_FORWARDED_FOR] => 18.220.112.210
    [HTTP_ACCEPT] => */*
    [HTTP_HOST] => knoxplanning.org
    [HTTP_X_MOSSO_DT] => PHP72-28 SSL VS
    [HTTP_CLUSTER_HTTPS] => on
    [HTTP_ACCEPT_ENCODING] => gzip, br, zstd, deflate
    [PATH] => /usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin
    [SERVER_SIGNATURE] => 
Apache/2.4 Server at knoxplanning.org Port 80
[SERVER_SOFTWARE] => Apache/2.4 [SERVER_NAME] => knoxplanning.org [SERVER_ADDR] => 10.40.240.221 [SERVER_PORT] => 80 [REMOTE_ADDR] => 18.220.112.210 [DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [REQUEST_SCHEME] => http [CONTEXT_PREFIX] => [CONTEXT_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [SERVER_ADMIN] => root@localhost [SCRIPT_FILENAME] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content/cases/index.php [REMOTE_PORT] => 62370 [REDIRECT_URL] => /cases/1-SC-23-C [REDIRECT_QUERY_STRING] => case=1-SC-23-C [GATEWAY_INTERFACE] => CGI/1.1 [SERVER_PROTOCOL] => HTTP/1.1 [REQUEST_METHOD] => GET [QUERY_STRING] => case=1-SC-23-C [REQUEST_URI] => /cases/1-SC-23-C [SCRIPT_NAME] => /cases/index.php [PHP_SELF] => /cases/index.php [REQUEST_TIME_FLOAT] => 1732193431.6 [REQUEST_TIME] => 1732193431 [argv] => Array ( [0] => case=1-SC-23-C ) [argc] => 1 )
1-SC-23-C | Planning Commission

Subdivision

Concept Plan

1-SC-23-C

Approved with conditions
by the Planning Commission

Approve the variance based on the recommendations of the Knox County Department of Engineering and Public Works.

APPROVE the Concept Plan subject to the following 5 conditions:


See case notes below

Request

Property Info

Case Notes

What's next?

Applicant Request

+
Subdivision
Parker's Forest
Lots
12 (Split)
Proposed Density
2.93

Variances

VARIANCES
1) Reduce the minimum vertical curve length from K=25 to K=20 at STA 10+65. Applicant requested K=15.

ALTERNATIVE DESIGN STANDARDS REQUIRING KNOX COUNTY ENGINEERING AND PUBLIC WORKS APPROVAL
** See the Requested Variances and Alternative Design Standards memo attached to the staff report.


Property Information

+
Location
0 GREENWELL RD

Northeast side of Greenwell Dr., northwest of Crystal Point Dr.

Commission District 7


Size
4.09 acres

Place Type Designation
LDR (Low Density Residential), HP (Hillside Protection)

Currently on the Property
Agriculture/Forestry/Vacant Land

Growth Plan
Rural Area

Case Notes

+
Disposition Summary
Approve the variance based on the recommendations of the Knox County Department of Engineering and Public Works.

APPROVE the Concept Plan subject to the following 5 conditions:

Staff Recommendation
Approve the variance based on the recommendations of the Knox County Department of Engineering and Public Works.

APPROVE the Concept Plan subject to the following 5 conditions:
1. Connection to sanitary sewer and meeting other relevant utility provider requirements.
2. Provision of street names which are consistent with the Uniform Street Naming and Numbering System for Knox County (Ord. 91-1-102).
3. Certification on the development plan by the applicant's surveyor that minimum sight distance in both directions on Greenwell Rd. is being met during the design plan phase.
4. Meeting all other applicable requirements of the Knox County Dept. of Engineering and Public Works.
5. If any building construction is proposed within the 50' buffer area around the designated sinkholes/depressions (including the depressions), a geotechnical report must be prepared by a registered engineer to determine soil stability and that report must be submitted to the Knox County Department of Engineering and Public Works for consideration. Any construction in these areas is subject to approval by the County following a review of the report. Engineered footings must be designed for these areas. For those lots that do not have a building site outside of the 50' buffer, approval by Knox County will be required prior to final plat approval. The sinkholes/depressions and 50' buffer shall be designated on the final plat even if they are approved to be filled.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Parker's Forest

Robert G. Campbell & Associates


Case History