$_POSTArray
(
)
$_GETArray
(
    [case] => 1-SE-23-C
)
$_SERVERArray
(
    [REDIRECT_HTTPS] => on
    [REDIRECT_UNIQUE_ID] => Z23ebOfQbEgpFneGr0Sc_AAAAAU
    [REDIRECT_PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [REDIRECT_STATUS] => 200
    [HTTPS] => on
    [UNIQUE_ID] => Z23ebOfQbEgpFneGr0Sc_AAAAAU
    [PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [HTTP_USER_AGENT] => Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
    [HTTP_X_FORWARDED_FOR] => 18.225.55.42
    [HTTP_ACCEPT] => */*
    [HTTP_HOST] => knoxplanning.org
    [HTTP_X_MOSSO_DT] => PHP72-28 SSL VS
    [HTTP_CLUSTER_HTTPS] => on
    [HTTP_ACCEPT_ENCODING] => gzip, br, zstd, deflate
    [PATH] => /usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin
    [SERVER_SIGNATURE] => 
Apache/2.4 Server at knoxplanning.org Port 80
[SERVER_SOFTWARE] => Apache/2.4 [SERVER_NAME] => knoxplanning.org [SERVER_ADDR] => 10.40.240.221 [SERVER_PORT] => 80 [REMOTE_ADDR] => 18.225.55.42 [DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [REQUEST_SCHEME] => http [CONTEXT_PREFIX] => [CONTEXT_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [SERVER_ADMIN] => root@localhost [SCRIPT_FILENAME] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content/cases/index.php [REMOTE_PORT] => 51298 [REDIRECT_URL] => /cases/1-SE-23-C [REDIRECT_QUERY_STRING] => case=1-SE-23-C [GATEWAY_INTERFACE] => CGI/1.1 [SERVER_PROTOCOL] => HTTP/1.1 [REQUEST_METHOD] => GET [QUERY_STRING] => case=1-SE-23-C [REQUEST_URI] => /cases/1-SE-23-C [SCRIPT_NAME] => /cases/index.php [PHP_SELF] => /cases/index.php [REQUEST_TIME_FLOAT] => 1735253612.418 [REQUEST_TIME] => 1735253612 [argv] => Array ( [0] => case=1-SE-23-C ) [argc] => 1 )
1-SE-23-C | Planning Commission

Subdivision

Concept Plan

1-SE-23-C

Approved with conditions
by the Planning Commission

Approve the requested variance based on the recommendations of the Knox County Department of Engineering and Public Works.

Approve the Concept Plan subject to 6 conditions.


See case notes below

Request

Property Info

Case Notes

What's next?

Applicant Request

+
Subdivision
O.T. Tindell Farm Subdivision
Lots
30 (Split)

Variances

1. Reduction of the vertical curve length on road A at STA 0+80 from 229.5" to 140' (K value from 25 to 15.3).


Property Information

+
Location
1108 E BEAVER CREEK DR

South side of E. Beaver Creek Drive, west of Dry Gap Pike

Commission District 7


Size
6.59 acres

Place Type Designation
LDR (Low Density Residential)

Currently on the Property
Rural Residential

Growth Plan
Planned Growth Area

Case Notes

+
Disposition Summary
Approve the requested variance based on the recommendations of the Knox County Department of Engineering and Public Works.

Approve the Concept Plan subject to 6 conditions.

Staff Recommendation
Approve the requested variance based on the recommendations of the Knox County Department of Engineering and Public Works.

Approve the Concept Plan subject to 6 conditions.
1) Connection to sanitary sewer and meeting other relevant utility provider requirements.
2) Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (Ord. 91-1-102).
3) Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation and the U.S. Army Corps of Engineers for any alteration to the existing pond and designated wetland on the site. The final determination regarding the proposed alteration of these features may require a modification of the layout of the subdivision.
4) Obtaining any off-site drainage easement that may be required for the discharge from the stormwater pond located between Lots 18 and 19.
5) Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6) Before certification of the final plat for the subdivision, establish a property owners association or other legal entity responsible for maintaining common facilities, such as common areas, amenities, private roads, and/or stormwater drainage systems.

What's next?

+
Appeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

O.T. Tindell Farm Subdivision

Trantanella Construction


Case History