Array
(
    [case] => 10-A-25-DT
)
$isadmin



10-A-25-DT | Design Review Board







































    
    
    
    
    
    
    
    



 
 
 


















 
 
 


Level I: Kress Building

10-A-25-DT  

Applicant Request
Level I: New thermal window installation
    • Installation of thermal windows on the interior side of fifteen second-story windows. Acrylic window inserts with silicone frames, manufactured by 'Indow,' will be installed inside existing window frames with a gap between the existing windowpane and the new thermal window. No modifications will be made to the original windows. New partition walls will not block the windows. Other scope of interior renovation is not reviewed with this application.

Applicable Guidelines
Downtown Design Guidelines
See Guidelines

Meeting Date
October 14, 2025

Kress Building
417 S. Gay St. 37902
DK-H (Downtown Knoxville, Historic Core Subdistrict)

Staff
Samiul Haque
Phone: 865-215-3794
Email: samiul.haque@knoxplanning.org

Case History

Date Filed
October 3, 2025

To be heard
October 14, 2025

Case History