Property Information
−
+
Location8234 Chapman Hwy.
North side of Chapman Highway, east side of E. Circle Drive
Commission District 9
Size3.29 acres
Place Type DesignationGC (General Commercial) / HP (Hillside Protection)
Currently on the Property
Self-storage
Growth PlanPlanned Growth Area
- Utilities
SewerKnox-Chapman Utility District
WaterKnox-Chapman Utility District
Case Notes
−
+
Disposition Summary
APPROVE the request to expand the existing self-storage facility with 2 new buildings and the expansion of 1 building, approximately 4,650 square feet of floor area, subject to 8 conditions:
Staff Recommendation
APPROVE the request to expand the existing self-storage facility with 2 new buildings and the expansion of 1 building, approximately 4,650 square feet of floor area, subject to 8 conditions:
1. Meeting all applicable requirements of the Knox County Zoning Ordinance.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Meeting all applicable requirements of the Knox County Fire Marshal's Office.
4. Meeting all applicable requirements of the Tennessee Department of Transportation.
5. All outdoor lighting shall be shielded to direct light and glare away from all adjoining property and public rights-of-way.
6. Meeting the paving requirements of Article 4, Section 4.93.01.B (Standards for Self-Service Storage Facilities) of the Knox County Zoning Ordinance for the entire facility, "a minimum twenty-six (26) foot parking/driveway lane shall be provided adjacent to all buildings when the buildings open only to one side of the lane and a minimum thirty (30) foot lane when the buildings open to both sides of the lane. All parking/driveway lanes shall be paved."
7. Providing a landscape plan to Planning Commission staff for review and approval before building permits are issued. The landscape plan must be consistent with the planting schedule provided on the develoment plan and include the species and location of the plantings.
8. Installation of the landscaping within 6 months of the issuance of an occupancy permit for this project, or posting a bond with the Knox County Dept. of Engineering and Public Works to guarantee its installation.
With the conditions noted above, this request meets all requirements for approval in the CA, as well as other criteria for approval of a use on review.