Property Information
−
+
Location5701 MILLERTOWN PIKE
North side of Millertown Pike, west of Mary Emily Ln.
Commission District 8
Size44.87 acres
Place Type DesignationLDR (Low Density Residential), HP (Hillside Protection)
Currently on the Property
Rural Residential, Agriculture/Forestry/Vacant Land, Single Family Residential
Growth PlanUrban Growth Area (Outside City Limits)
- Utilities
SewerKnoxville Utilities Board
WaterNortheast Knox Utility District
Case Notes
−
+
Disposition Summary
Approve the alternative design standards based on the recommendation of the Knox County Department of Engineering and Public Works.
Approve the Concept Plan subject to 16 conditions.
Staff Recommendation
Approve the alternative design standards based on the recommendation of the Knox County Department of Engineering and Public Works.
Approve the Concept Plan subject to 16 conditions.
1) Connection to sanitary sewer and meeting other relevant utility provider requirements.
2) Implementing the recommendations of the Millertown Pike Subdivision Transportation Impact Study (AJAX, revised 11/22/2023) as required by Knox County Engineering and Public Works during the design plan phase. A Memorandum of Understanding with Knox County Engineering and Public Works is required per Chapter 54, Article V of the Knox County Code (Ord. O-23-4-102). See Exhibit B.
3) As recommended by the Transportation Impact Study and Knox County Engineering and Public Works, a maximum of 46 lots may be platted before the Memorandum of Understanding for the left turn lane on Millertown Pike is approved by Knox County and funded by the applicant.
4) Obtaining 250 ft of intersection sight distance within the right-of-way at all internal intersections or providing a 250-ft sight distance easement across lots and/or common area per the requirements of Knox County Engineering and Public Works during the design plan phase. Any driveways on these lots must be located outside the sight distance easement and shown on the plat, or the driveways must have a depth of 20 ft beyond the sight distance easement if they cannot be located outside the sight distance easement.
5) Obtaining 400 ft of intersection sight distance entirely within the Millertown Pike right-of-way or providing a 400-ft sight distance easement across lots and/or common area per the requirements of Knox County Engineering and Public Works during the design plan phase.
6) Providing access for 5713 Millertown Pike (parcel 060-024) to the Road 'B' cul-de-sac as shown on the concept plan.
7) Providing a temporary turnaround at the eastern terminus of Road 'E' and Road 'F' per the requirements of Knox County Engineering and Public Works during the design plan phase. The 50 ft public right-of-way shall be extended to the property boundary as shown on the concept plan with notification of future connection provided per section 3.04.C.2 of the Subdivision Regulations. The temporary turnaround area outside the 50 ft right-of-way may be in an easement with the approval of Knox County Engineering and Public Works. The easement or right-of-way for the temporary turnaround can be eliminated if the public road is extended and the turnaround is no longer required.
8) Installing a sidewalk on one side of Road 'G' frontage per Chapter 54, Article IV of the Knox County Code. The final design of the sidewalk will be determined by Knox County Engineering and Public Works during the design plan phase.
9) Proving a maximum intersection grade of 2 percent on Road 'G' at Millertown Pike.
10) The driveway slope within the right-of-way shall not exceed 2 percent for lots 78-90 for the future installation of sidewalks.
11) The grading within the HP (Hillside Protection) area, north of Road 'A', shall be limited to what is proposed on the concept plan or otherwise in conformance with the zoning condition limiting disturbance on slopes of 25 percent or greater.
12) Providing a note on the final plat that all lots shall have vehicular access from internal roads, except for lot 89.
13) Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
14) Meeting all applicable requirements of the Knox County Zoning Ordinance.
15) Provision of street names consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
16) Before certification of the final plat for the subdivision, establish a property owners association or other legal entity responsible for maintaining common facilities, such as common areas, amenities, private roads, and/or stormwater drainage systems.
This proposal is for a 90-lot detached residential subdivision on this 44.87-acre site at a density of 2.0 du/ac. The property was rezoned from A (Agricultural) to PR(k) (Planned Residential) up to 2.75 du/ac subject to 1 condition in October 2023 (9-E-23-RZ).
ZONING CONDITION
The zoning condition is that "The rear of the parcel with slopes of 25% or greater shall be left undisturbed." The rezoning staff report does not include a supplemental map delineating the area to be left undisturbed, but the staff comments state this is intended for the northern portion of the property. The interpretation is that this condition applies to the northernmost portion of the site, north of Road 'A' on the concept plan, which is part of the linear McAnnally Ridge formation, not the smaller HP area to the south of Road 'A'.
HILLSIDE PROTECTION
There are 27.4 acres of this 44.9-acre site in the HP (Hillside Protection) area. The slope analysis recommends limiting disturbance in the HP area to 8.7 acres (31.8 percent). This proposal disturbs approximately 10.6 acres (38.7 percent) of the HP area. The upper slopes of McAnnally Ridge remain undisturbed.
TRANSPORTATION
The Transportation Impact Study (TIS) concludes that an eastbound left turn lane on Millertown Pike, at the Road 'A' intersection, is required to be constructed before the 47th house in the development is constructed. The applicant must enter a Memorandum of Understanding (MOU) with Knox County for the construction of the turn lane and that only 46 lots may be platted before the MOU is approved by Knox County and funded by the applicant.