Street Closure
3-A-26-SC
Recommendations
See agency comments and recommendations below
Request
Recommendations
Property Info
Case Notes
What's next?
Applicant Request
− +Close Street
From E Oklahoma Ave
Northwest corner of Parcel 081LP018
Northwest corner of Parcel 081LP018
To Folsom Ave
Northeast corner of Parcel 081LP018
Northeast corner of Parcel 081LP018
Reason for Closure
Sidewalks were never installed. The Church has been occupying the area as a playground and have installed an iron fence around it.
Comments / Recommendations
− +The applicant initially requested a larger closure area, with the western boundary starting at 20.56' from the centerline of the pavement of E Oklahoma Avenue. Later, they adjusted the closure area to start at 25' from the centerline of the street, in accordance with City Engineering feedback. The reviewing departments and organizations provided the following comments. All review remarks, except for those from Planning, were based on the original request.
-- PLANNING: Planning recommends approval of the right-of-way closure request because adequate right-of-way width is preserved for future sidewalk connections.
The church has installed a fence within the public right-of-way for its playground (see "Chainlink Fence" identified on the attached plan). However, this area falls within the Parental Responsibilities Zones (PRZ) of Christenberry Elementary, Whittle Springs Middle, and Fulton High schools, so a sidewalk is required at this site. Except for the frontage of the subject parcel, the entire length of E Oklahoma Avenue between Alexander Street and Folsom Avenue has sidewalks on both sides (see Exhibit A). The missing sidewalk connection in front of the church is identified in the City's Sidewalk Study as a recommended future connection. The depth of right-of-way requested to be closed leaves approximately 10 ft of right-of-way from the existing pavement edge of the street, which is sufficient to accommodate a sidewalk that meets ADA and the City's design standards, though the fence may need to be relocated.
-- ENGINEERING: City Engineering has objections to this closure area, as presented, due to the fact that this street is improved and functioning as a public right-of-way and also due to its proximity to a fairly irregular intersection network of streets to the east. Reducing the right-of-way in this area could prove to be problematic if future improvements are needed.
However, the City could support a closure area that is offset no less than 25 feet from the centerline of the existing street pavement along the property of 510 E Oklahoma Ave. This width should be adequate to reserve enough area for continued street support.
If the applicant still wishes to proceed with closure, they would need to do the following:
1. Adjust the closure area to state that the offset will be at a 25 feet minimum from the existing street centerline of pavement.
2. Employ their surveyor to provide a certified map exhibit showing the metes and bounds and area calculations, along with proper tie information to the abutting boundary, to be used in the legal description for the closure area.
Further, should this right-of-way be closed, the City will reserve easements for all drainage facilities and utilities, if there are any current facilities, located in or within five (5) feet of the property described herein. No easements are reserved if there are no current facilities within the closure area. If any existing facilities or utilities are found not feasible to the site development or use, they may be removed and relocated, subject to City Engineering and/or other applicable easement holder review and approval.
** The applicant has adjusted the closure area per Engineering comments, and the current request meets the above-mentioned Engineering comments.**
-- ADDRESSING: The proposed ROW closure is not expected to impact any existing addresses.
-- FIRE: The right-of-way closure does not affect Fire Department's access to surrounding residential housing.
-- KUB: We have reviewed our records and find that we have existing utility facilities located within the subject right-of-way. The approximate locations of these facilities are indicated on the enclosed prints. However, KUB does not release and hereby retains all easements and rights for existing utility facilities, whether or not shown on these prints.
Should this right-of-way be closed, KUB will require the following permanent easements for its utility facilities: Gas - 7.5 feet on each side of the centerline of the gas line, 15 feet total width.
-- AT&T: AT&T has reviewed the request and does not oppose the proposed vacation of this right-of-way, as there is no current or anticipated future need for the ROW to support AT&T facilities or operations.
-- TDOT: The Department has no comments on the following request from an operations perspective.
-- PLANNING: Planning recommends approval of the right-of-way closure request because adequate right-of-way width is preserved for future sidewalk connections.
The church has installed a fence within the public right-of-way for its playground (see "Chainlink Fence" identified on the attached plan). However, this area falls within the Parental Responsibilities Zones (PRZ) of Christenberry Elementary, Whittle Springs Middle, and Fulton High schools, so a sidewalk is required at this site. Except for the frontage of the subject parcel, the entire length of E Oklahoma Avenue between Alexander Street and Folsom Avenue has sidewalks on both sides (see Exhibit A). The missing sidewalk connection in front of the church is identified in the City's Sidewalk Study as a recommended future connection. The depth of right-of-way requested to be closed leaves approximately 10 ft of right-of-way from the existing pavement edge of the street, which is sufficient to accommodate a sidewalk that meets ADA and the City's design standards, though the fence may need to be relocated.
-- ENGINEERING: City Engineering has objections to this closure area, as presented, due to the fact that this street is improved and functioning as a public right-of-way and also due to its proximity to a fairly irregular intersection network of streets to the east. Reducing the right-of-way in this area could prove to be problematic if future improvements are needed.
However, the City could support a closure area that is offset no less than 25 feet from the centerline of the existing street pavement along the property of 510 E Oklahoma Ave. This width should be adequate to reserve enough area for continued street support.
If the applicant still wishes to proceed with closure, they would need to do the following:
1. Adjust the closure area to state that the offset will be at a 25 feet minimum from the existing street centerline of pavement.
2. Employ their surveyor to provide a certified map exhibit showing the metes and bounds and area calculations, along with proper tie information to the abutting boundary, to be used in the legal description for the closure area.
Further, should this right-of-way be closed, the City will reserve easements for all drainage facilities and utilities, if there are any current facilities, located in or within five (5) feet of the property described herein. No easements are reserved if there are no current facilities within the closure area. If any existing facilities or utilities are found not feasible to the site development or use, they may be removed and relocated, subject to City Engineering and/or other applicable easement holder review and approval.
** The applicant has adjusted the closure area per Engineering comments, and the current request meets the above-mentioned Engineering comments.**
-- ADDRESSING: The proposed ROW closure is not expected to impact any existing addresses.
-- FIRE: The right-of-way closure does not affect Fire Department's access to surrounding residential housing.
-- KUB: We have reviewed our records and find that we have existing utility facilities located within the subject right-of-way. The approximate locations of these facilities are indicated on the enclosed prints. However, KUB does not release and hereby retains all easements and rights for existing utility facilities, whether or not shown on these prints.
Should this right-of-way be closed, KUB will require the following permanent easements for its utility facilities: Gas - 7.5 feet on each side of the centerline of the gas line, 15 feet total width.
-- AT&T: AT&T has reviewed the request and does not oppose the proposed vacation of this right-of-way, as there is no current or anticipated future need for the ROW to support AT&T facilities or operations.
-- TDOT: The Department has no comments on the following request from an operations perspective.
Property Information
− +Location
Planning Sector
0 E. Oklahoma Ave.
Council District 4
Planning Sector
Central City
What's next?
− +- Appeal to Because of its location in the CITY, appeals will be heard by Knoxville City Council
Applicant
Michael S. Greene
Case History
- April 13, 2026
Date Filed