$_POSTArray
(
)
$_GETArray
(
    [case] => 6-SD-02-C
)
$_SERVERArray
(
    [REDIRECT_HTTPS] => on
    [REDIRECT_UNIQUE_ID] => Z25RjhKZVBIvB39z4qdntQAAAAo
    [REDIRECT_PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [REDIRECT_STATUS] => 200
    [HTTPS] => on
    [UNIQUE_ID] => Z25RjhKZVBIvB39z4qdntQAAAAo
    [PHP_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content
    [HTTP_USER_AGENT] => Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
    [HTTP_X_FORWARDED_FOR] => 18.119.133.214
    [HTTP_ACCEPT] => */*
    [HTTP_HOST] => knoxplanning.org
    [HTTP_X_MOSSO_DT] => PHP72-28 SSL VS
    [HTTP_CLUSTER_HTTPS] => on
    [HTTP_COOKIE] => X-Mapping-oihobbed=7BA17E431C130BB058C051FD183FD56D
    [HTTP_ACCEPT_ENCODING] => gzip, br, zstd, deflate
    [PATH] => /usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/sbin:/bin
    [SERVER_SIGNATURE] => 
Apache/2.4 Server at knoxplanning.org Port 80
[SERVER_SOFTWARE] => Apache/2.4 [SERVER_NAME] => knoxplanning.org [SERVER_ADDR] => 10.40.241.171 [SERVER_PORT] => 80 [REMOTE_ADDR] => 18.119.133.214 [DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [REQUEST_SCHEME] => http [CONTEXT_PREFIX] => [CONTEXT_DOCUMENT_ROOT] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content [SERVER_ADMIN] => root@localhost [SCRIPT_FILENAME] => /mnt/stor12-wc2-dfw1/599257/www.knoxplanning.org/web/content/cases/index.php [REMOTE_PORT] => 53828 [REDIRECT_URL] => /cases/6-SD-02-C [REDIRECT_QUERY_STRING] => case=6-SD-02-C [GATEWAY_INTERFACE] => CGI/1.1 [SERVER_PROTOCOL] => HTTP/1.1 [REQUEST_METHOD] => GET [QUERY_STRING] => case=6-SD-02-C [REQUEST_URI] => /cases/6-SD-02-C [SCRIPT_NAME] => /cases/index.php [PHP_SELF] => /cases/index.php [REQUEST_TIME_FLOAT] => 1735283086.184 [REQUEST_TIME] => 1735283086 [argv] => Array ( [0] => case=6-SD-02-C ) [argc] => 1 )
6-SD-02-C | Planning Commission

Subdivision

Concept Plan

6-SD-02-C

Approved
by the Planning Commission

APPROVE variances 1-3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 8 conditions:


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Obtaining approval from County Commission on the zoning change to PR at 1-5 du/ac.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
4. Compaction testing pursuant to the requirements of the Knox County Department of Engineering and Public Works will be required for all fill areas.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Any expansion of the subdivision to the tract to the west of this unit (extension of Road D) will require the submission of a revised traffic impact study.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
Meadows of Millertown, Unit 2
Lots
44 (Split)
Proposed Density
3.44 du/ac

Variances

1. Intersection grade variance for Road B at Fernbank Rd, from 1% to 3%.
2. Vertical curve variance at station 1+40 on Road D, from 125' to 75'.
3. Vertical curve variance at station 3+25 on Road D, from 240' to 150'.


Property Information

+
Location
South terminus of Fernbank Rd., south of Sable Pointe Ln. and Millertown Pike.

Commission District 8


Size
12.78 acres


Currently on the Property
Vacant land

Growth Plan
Urban Growth Area (Outside City Limits)

Case Notes

+
Disposition Summary
APPROVE variances 1-3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 8 conditions:

Details of Action
1. Obtaining approval from County Commission on the zoning change to PR at 1-5 du/ac.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
4. Compaction testing pursuant to the requirements of the Knox County Department of Engineering and Public Works will be required for all fill areas.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Any expansion of the subdivision to the tract to the west of this unit (extension of Road D) will require the submission of a revised traffic impact study.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Staff Recommendation
APPROVE variances 1-3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 8 conditions:
1. Obtaining approval from County Commission on the zoning change to PR at 1-5 du/ac.
2. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
3. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
4. Compaction testing pursuant to the requirements of the Knox County Department of Engineering and Public Works will be required for all fill areas.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Any expansion of the subdivision to the tract to the west of this unit (extension of Road D) will require the submission of a revised traffic impact study.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

What's next?

+
Appeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Meadows of Millertown, Unit 2

Southland Group Inc.


Case History