Property Information
−
+
Location5831 Rutledge Pike
Northwest side of Rutledge, southwest of Transport Way
Commission District 8
Census Tract 52.02
Size5.21 acres
Place Type DesignationGC (General Commercial)
Currently on the Property
Unused & Residential
Growth PlanUrban Growth Area
- Utilities
SewerKnoxville Utilities Board
WaterNortheast Knox Utility District
Case Notes
−
+
Disposition Summary
APPROVE the development plan for a self-service storage facility with approximately 92,900 square feet of building area, 20 covered vehicle spaces, and associated office/residence, subject to 8 conditions.
Staff Recommendation
APPROVE the development plan for a self-service storage facility with approximately 92,900 square feet of building area, 20 covered vehicle spaces, and associated office/residence, subject to 8 conditions.
1) Meeting all applicable requirements of the Knox County Zoning Ordinance, including but not limited to the sign standards (Article 3, Section 3.90).
2) Meeting all applicable requirements of the Knox County Health Department and/or connection to sanitary sewer and meeting any other relevant requirements of the utility provider.
3) Meeting all applicable requirements of the Knox County Department of Engineering and Public Works, including but not limited to the grade of the entry driveway.
4) Meeting all applicable requirements of the Knox County Fire Marshal.
5) Meeting all applicable requirements of the Knoxville Department of Engineering and TDOT for the driveway apron design and other improvements within the Rutledge Pike right-of-way.
6) All outdoor lighting shall be shielded to direct light and glare away from all adjoining property and public right-of-way.
7) Obtaining all necessary approvals from the adjacent property owner at 5822 Rutledge Pike (parcel 060 08401) to relocate the existing access easement to the proposed driveway for the self-storage facility and restricting access to the property by requiring entry and exit through the gated entry to the self-storage facility.
8) Installation of all landscaping shown on development plan within six months of the issuance of occupancy permits, or posting a bond with the Knox County Department of Engineering and Public Works to guarantee such installation.
With the conditions noted above, this request meets all requirements for approval in the CB zone, as well as other criteria for approval of a use on review.