Property Information
−
+
Location0 BALL RD
Northwest of Schaad Road, southeast of Ball Road
Commission District 6
Size7.35 acres
Place Type DesignationMU-SD (Mixed Use Special District), HP (Hillside Protection)
Currently on the Property
Agriculture/Forestry/Vacant Land
Growth PlanUrban Growth Area (Outside City Limits)
- Utilities
SewerKnoxville Utilities Board
WaterKnoxville Utilities Board
Case Notes
−
+
Disposition Summary
Approve the variances and alternative design standard based on the justification provided by the applicant and recommendations of the Knox County Department of Engineering and Public Works.
Approve the Concept Plan subject to 7 conditions.
Staff Recommendation
Approve the variances and alternative design standard based on the justification provided by the applicant and recommendations of the Knox County Department of Engineering and Public Works.
Approve the Concept Plan subject to 7 conditions.
1) Connection to sanitary sewer and meeting other relevant utility provider requirements.
2) Provision of street names consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3) No building permits may be issued until the Schaad Road improvements are completed between Lobetti Road and the terminus of Schaad Road to the east, as determined by Planning staff and Knox County Engineering and Public Works staff.
4) Providing a stream determination study to the Knox County Department of Engineering and Public Works for review and approval regarding a potential stream located in the northeast corner of the property. If it is determined that this is a stream, the required stream buffers must be provided and lots may have to be eliminated. Changes to the location of dwelling units or the internal road system may require a new Concept Plan and Development Plan approval by the Planning Commission.
5) Providing a road stub-out to the property to the east with notification of future connection provided per section 3.04.C.2 of the Subdivision Regulations. The realignment of lots and the road alignment can be administratively approved by Planning staff and Knox County Engineering and Public Works during the design plan phase. If the potential stream referenced in condition #4 is determined to be a stream, the stub-out is not required.
6) Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7) Meeting all applicable requirements of the Knox County Zoning Ordinance.