Recommended for approval
by the Planning Commission
Approve Variances 1-3
APPROVED Final Plat
Approve Variances 1-3
APPROVED Final Plat
1. To allow an additional lot on an existing 20' JPE instead of the required 40'.
2. To allow the existing paved JPE surface to remain 15' wide instead of the required 20' wide.
3. To allow the existing 20' JPE to not have a turn-around.
Commission District 5
Dan Gamble