Subdivision

Concept Plan

3-SF-04-C

Recommended for approval
by the Planning Commission

APPROVE variances 1- 3 because the site's topography and rock outcroppings restrict compliance with the Subdivision Regulations. DENY variance 4.
APPROVE the concept plan subject to 6 conditions


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Meeting all requirements of the approved Use-on-Review development plan.
4. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
5. Provision of AASHTO approved turn around at the end of both joint permanent easements.
6. Noting the minimum floor elevation, as determined by the Knox County Dept. of Engineering and Public Works, for lot 13 on the final plat.

Applicant Request

+
Subdivision
Osprey Point Subdivision
Lots
14 (Split)
Proposed Density
1.75 du/ac

Variances

1. Vertical curve variance from 425' to 300' at sta. 3+42 of Road A.
2. Intersection grade variance from 1% to 2% on Road B at Road A.
3. Intersection grade variance from 1% to 2% at Road A and Ospery Point Ln.
4. 15' pavement width on Road A cull de sac.


Property Information

+
Location
South side of Osprey Point Ln., southeast of S. Northshore Dr.

Commission District 4


Size
8.73 acres

Sector
Southwest County

Currently on the Property
Vacant land

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE variances 1- 3 because the site's topography and rock outcroppings restrict compliance with the Subdivision Regulations. DENY variance 4.
APPROVE the concept plan subject to 6 conditions

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Meeting all requirements of the approved Use-on-Review development plan.
4. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
5. Provision of AASHTO approved turn around at the end of both joint permanent easements.
6. Noting the minimum floor elevation, as determined by the Knox County Dept. of Engineering and Public Works, for lot 13 on the final plat.
Disposition Summary
APPROVE variances 1- 3 because the site's topography and rock outcroppings restrict compliance with the Subdivision Regulations. DENY variance 4.
APPROVE the concept plan subject to 6 conditions

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Meeting all requirements of the approved Use-on-Review development plan.
4. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
5. Provision of AASHTO approved turn around at the end of both joint permanent easements.
6. Noting the minimum floor elevation, as determined by the Knox County Dept. of Engineering and Public Works, for lot 13 on the final plat.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Osprey Point Subdivision

Fulgum MacIndoe


Case History