Details of Action
−
+
1. Connection to sanitary sewer and meeting all other applicable requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Installation of sidewalks on at least one side of Ashby Field Ln. and Road B as shown on the concept plan. Sidewalks shall meet all applicable requirements of the Americans with Disabilities Act (ADA) and shall be installed at the time the street improvements are installed for the subdivision
4. Completing the construction of the left and right turn lanes as called for in the traffic impact study as required by the Knox County Department of Engineering and Public Works prior to the issuance of the 60th building permit in this development (60th of 116) .
5. Relocating the existing mail boxes and the associated parking as required by the Knox County Dept. of Engineering and Public Works
6. Relocating the existing real estate for sale sign at the entrance of the development such that it does not block the required corner sight distance
7. Meeting all other applicable requirements of the Knox County Department of Engineering and Public Works.
8 Final approval by the Knox County Commission of the rezoning of this site to PR (Planned Residential) at a density of 3.18 du/ac or greater
9. Providing the correct map and parcel number on the concept plan. (047-245)
10. Placing a note on the final plat that all lots shall have access only to the internal street system.
11. Prior to final plat approval establish a homeowners association that will be responsible for maintenance of stormwater facilities and any other commonly held assets
12. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Property Information
−
+
LocationNortheast side of Dry Gap Pk., southeast of Autumn Path Ln.
Commission District 7
Size17.30 acres
Sector
Currently on the Property
Vacant land
Growth PlanPlanned Growth Area
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerHallsdale-Powell Utility District
TelephoneAT&T
WaterHallsdale-Powell Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1 - 4 because site conditions restrict compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the concept plan subject to 12 conditions
1. Connection to sanitary sewer and meeting all other applicable requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Installation of sidewalks on at least one side of Ashby Field Ln. and Road B as shown on the concept plan. Sidewalks shall meet all applicable requirements of the Americans with Disabilities Act (ADA) and shall be installed at the time the street improvements are installed for the subdivision
4. Completing the construction of the left and right turn lanes as called for in the traffic impact study as required by the Knox County Department of Engineering and Public Works prior to the issuance of the 60th building permit in this development (60th of 116) .
5. Relocating the existing mail boxes and the associated parking as required by the Knox County Dept. of Engineering and Public Works
6. Relocating the existing real estate for sale sign at the entrance of the development such that it does not block the required corner sight distance
7. Meeting all other applicable requirements of the Knox County Department of Engineering and Public Works.
8 Final approval by the Knox County Commission of the rezoning of this site to PR (Planned Residential) at a density of 3.18 du/ac or greater
9. Providing the correct map and parcel number on the concept plan. (047-245)
10. Placing a note on the final plat that all lots shall have access only to the internal street system.
11. Prior to final plat approval establish a homeowners association that will be responsible for maintenance of stormwater facilities and any other commonly held assets
12. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1 - 4 because site conditions restrict compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the concept plan subject to 12 conditions
Details of Action
1. Connection to sanitary sewer and meeting all other applicable requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Installation of sidewalks on at least one side of Ashby Field Ln. and Road B as shown on the concept plan. Sidewalks shall meet all applicable requirements of the Americans with Disabilities Act (ADA) and shall be installed at the time the street improvements are installed for the subdivision
4. Completing the construction of the left and right turn lanes as called for in the traffic impact study as required by the Knox County Department of Engineering and Public Works prior to the issuance of the 60th building permit in this development (60th of 116) .
5. Relocating the existing mail boxes and the associated parking as required by the Knox County Dept. of Engineering and Public Works
6. Relocating the existing real estate for sale sign at the entrance of the development such that it does not block the required corner sight distance
7. Meeting all other applicable requirements of the Knox County Department of Engineering and Public Works.
8 Final approval by the Knox County Commission of the rezoning of this site to PR (Planned Residential) at a density of 3.18 du/ac or greater
9. Providing the correct map and parcel number on the concept plan. (047-245)
10. Placing a note on the final plat that all lots shall have access only to the internal street system.
11. Prior to final plat approval establish a homeowners association that will be responsible for maintenance of stormwater facilities and any other commonly held assets
12. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.