1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
4. Identifying the floodway, no fill line, 100 and 500 year flood fringe, and the minimum floor elevations for Lots 8 - 11 on the final plat.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all requirements of the approved use-on-review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
Miller's Plantation, Unit 3
Lots
20 (Split)
Proposed Density
4.18 du/ac

Variances

None


Property Information

+
Location
Southeast side of Ball Rd. at Dyestone Gap Rd, at the end of Rhyne Cove Ln.

Commission District 6


Size
4.79 acres

Sector
Northwest County

Currently on the Property
Vacant land

Growth Plan
Urban Growth Area (Outside City Limits)

Case Notes

+
Staff Recommendation
APPROVE the concept plan subject to 7 conditions
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
4. Identifying the floodway, no fill line, 100 and 500 year flood fringe, and the minimum floor elevations for Lots 8 - 11 on the final plat.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all requirements of the approved use-on-review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE the concept plan subject to 7 conditions
Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
4. Identifying the floodway, no fill line, 100 and 500 year flood fringe, and the minimum floor elevations for Lots 8 - 11 on the final plat.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all requirements of the approved use-on-review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.