APPROVE variances 1 - 4 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 9 conditions:


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Submitting detailed plans to the Knox County Department of Engineering and Public Works at the design plan stage of the subdivision to address the transition from Olive Branch Ln. into Road H prior to completion of the Schaad Rd. extension and the transition of these two streets into the Schaad Rd. extension when it is completed.
4. Prior to final plat approval, the right-of-way for the Schaad Rd. extension shall be dedicated so that a public street connection will be established between the existing Olive Branch Ln. and Road H in the second unit of the subdivision.
5. Identifying the slope easement for the Schaad Rd. extension on the final plat. If the final plat is to be recorded prior to the completion of the Schaad Rd. extension, the temporary construction easement shall also be shown on the plat.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Placing a note on the final plat that all lots will have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
Glenlake Subdivision, Unit 2 (FKA - Rufus H. Smith Jr. & Company on Ball Camp Pike - North Section)
Lots
56 (Split)
Proposed Density
2.83 du/ac
Residential?
No

Variances

1. Tangent length variance for broken back curve on Road H from STA 5+46 to STA 6+02, from 150' to 56'.
2. Horizontal curve variance on Road H at STA 4+50, from 250' to 150'.
3. Horizontal curve variance on Road H at STA 7+50, from 250' to 150'.
4. Vertical curve variance on Road I at STA 8+75, from 160.75' to 150'.


Property Information

+
Location
North of Ball Camp Pike, west of Johnson Rd.

Commission District 6


Size
19.80 acres

Sector
Northwest County

Currently on the Property
Vacant land

Growth Plan
Urban Growth Area (Outside City Limits)

Case Notes

+
Staff Recommendation
APPROVE variances 1 - 4 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 9 conditions:

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Submitting detailed plans to the Knox County Department of Engineering and Public Works at the design plan stage of the subdivision to address the transition from Olive Branch Ln. into Road H prior to completion of the Schaad Rd. extension and the transition of these two streets into the Schaad Rd. extension when it is completed.
4. Prior to final plat approval, the right-of-way for the Schaad Rd. extension shall be dedicated so that a public street connection will be established between the existing Olive Branch Ln. and Road H in the second unit of the subdivision.
5. Identifying the slope easement for the Schaad Rd. extension on the final plat. If the final plat is to be recorded prior to the completion of the Schaad Rd. extension, the temporary construction easement shall also be shown on the plat.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Placing a note on the final plat that all lots will have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1 - 4 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 9 conditions:

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Submitting detailed plans to the Knox County Department of Engineering and Public Works at the design plan stage of the subdivision to address the transition from Olive Branch Ln. into Road H prior to completion of the Schaad Rd. extension and the transition of these two streets into the Schaad Rd. extension when it is completed.
4. Prior to final plat approval, the right-of-way for the Schaad Rd. extension shall be dedicated so that a public street connection will be established between the existing Olive Branch Ln. and Road H in the second unit of the subdivision.
5. Identifying the slope easement for the Schaad Rd. extension on the final plat. If the final plat is to be recorded prior to the completion of the Schaad Rd. extension, the temporary construction easement shall also be shown on the plat.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Placing a note on the final plat that all lots will have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Glenlake Subdivision, Unit 2 (FKA - Rufus H. Smith Jr. & Company on Ball Camp Pike - North Section)

Rufus H. Smith Jr. & Company


Case History