Details of Action
−
+
1. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (Ord. 91-1-102).
3. Provision of sight distance easements, to be reflected on the final plat, across Lots 64 and 65 as required by the Knox County Department of Engineering and Public Works.
4. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkhole (closed contour area) identified on the plat in the area of Lots 25, 114, 117 and 118. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration of the blueline stream and sinkhole.
7. Obtaining approval from the Tennessee Valley Authority (TVA), prior to final plat approval, for the location of the entrance road within their transmission line easement.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Property Information
−
+
LocationNorthwest side of Hill Rd., north of Cabbage Dr.
Commission District 8
Size68.26 acres
Sector
Currently on the Property
Vacant land
Growth PlanPlanned Growth Area & Rural Area
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerHallsdale-Powell Utility District
TelephoneMetro Group Bell South Telephone
WaterHallsdale-Powell Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1-12 because the site's topography and limited access restricts compliance with the Subdivision Regulations.
APPROVE the concept plan subject to 9 conditions
1. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (Ord. 91-1-102).
3. Provision of sight distance easements, to be reflected on the final plat, across Lots 64 and 65 as required by the Knox County Department of Engineering and Public Works.
4. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkhole (closed contour area) identified on the plat in the area of Lots 25, 114, 117 and 118. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration of the blueline stream and sinkhole.
7. Obtaining approval from the Tennessee Valley Authority (TVA), prior to final plat approval, for the location of the entrance road within their transmission line easement.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Disposition Summary
APPROVE variances 1-12 because the site's topography and limited access restricts compliance with the Subdivision Regulations.
APPROVE the concept plan subject to 9 conditions
Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (Ord. 91-1-102).
3. Provision of sight distance easements, to be reflected on the final plat, across Lots 64 and 65 as required by the Knox County Department of Engineering and Public Works.
4. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkhole (closed contour area) identified on the plat in the area of Lots 25, 114, 117 and 118. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration of the blueline stream and sinkhole.
7. Obtaining approval from the Tennessee Valley Authority (TVA), prior to final plat approval, for the location of the entrance road within their transmission line easement.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.