Details of Action
−
+
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction or fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Meeting all requirements of the approved use on review development plan.
4. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knoxville (Ord. 0-280-90).
6. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
7. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
8. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Property Information
−
+
LocationWest side of Fox Rd., south of Pipkin Ln.
Council District 2
Size31.70 acres
Sector
Currently on the Property
Vacant land
Growth PlanUrban Growth Area (Outside City Limits)
- Utilities
ElectricityLenoir City Utility District
Natuarl GasKnoxville Utilities Board
SewerFirst Knox Utility District
TelephoneMetro Group Bell South Telephone
WaterFirst Knox Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1-3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard
APPROVE the concept plan subject to 8 conditions
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction or fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Meeting all requirements of the approved use on review development plan.
4. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knoxville (Ord. 0-280-90).
6. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
7. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
8. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Disposition Summary
APPROVE variances 1-3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard
APPROVE the concept plan subject to 8 conditions
Details of Action
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction or fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Meeting all requirements of the approved use on review development plan.
4. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knoxville (Ord. 0-280-90).
6. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
7. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
8. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.