Property Information
−
+
Location0 Mission Hill Ln.
West side of Mission Hills Ln, north side of Hardin Valley Rd
Commission District 6
Size2.90 acres
Place Type DesignationRR (Rural Residential), HP (Hillside Protection), SP (Stream Protection)
Currently on the Property
Agriculture/Forestry/Vacant Land
Growth PlanRural Area
- Utilities
SewerWest Knox Utility District
WaterWest Knox Utility District
Case Notes
−
+
Disposition Summary
Approve the Concept Plan subject to 9 conditions.
Staff Recommendation
Approve the Concept Plan subject to 9 conditions.
1) Connection to sanitary sewer and meeting other relevant utility provider requirements.
2) The centralized mail kiosk for the Lantern Park Subdivision must be located along Lantern Park Lane, subject to the United States Postal Service (USPS) approving the new location. The kiosk must be moved prior to the certification of a final plat for lots in Phase 2. If the USPS denies relocation of the kiosk, documentation of the denial must be provided to Knox County Engineering and Public Works before certification.
3) Providing an access easement for the sidewalk through Lot 27 and OS-3 per the requirements of Knox County Engineering and Public Works during the design plan phase.
4) Providing a minimum 30 ft greenway easement on the south side of Connor Creek per the requirements of Knox County Parks and Recreation and Knox County Engineering and Public Works during the design plan phase.
5) Meeting all applicable requirements of the Knox County Zoning Ordinance, including but not limited to the intersection spacing requirements of Article 3, Section 3.51.02.C. of the Knox County Zoning Ordinance.
6) Providing a sidewalk along the Mission Hill Lane frontage per the requirements of the Knox County Sidewalk Ordinance.
7) Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
8) Renumbering the lots on the Final Plat for Phase 2 so as not to skip lot numbers and as otherwise required per Article 2.10.F.9.
9) Before certification of the final plat for the subdivision, establish a property owners association or other legal entity responsible for maintaining common facilities, such as common areas, amenities, private roads, and/or stormwater drainage systems.
This proposal is Phase 2 of the Lantern Park Subdivision, which includes seven detached residential lots and a modification of the stormwater management system. If approved, the Lantern Park Subdivision will have a total of 25 lots. Five proposed lots have access to Mission Hill Lane, and two have access to Lantern Park Lane. The subdivision was originally proposed with two detention ponds on either end of Lantern Park Lane. This concept plan application consolidates them into one detention pond along Mission Hill Lane on the proposed open space lot OS-4.
The concept plan states that Phase 2's acreage is 2.9 acres. However, the total acreage of the Lantern Park Subdivision will only increase by 1.87 acres to approximately 8.85 acres. The platted open space lot OS-1R in Phase 1 is being incorporated into Phase 2. Lot OS-1R was intended for a detention pond that is no longer needed with the approval of this concept plan and is proposed to be split into two house lots.
The application and staff report include open space lot OS-2 (parcel 116ME012), located on the northwest side of the Lantern Park Lane cul-de-sac because it was intended for a detention pond that is no longer needed with the approval of this concept plan. Lot OS-2 is not shown on the Concept Plan because it is a platted lot and the open space use and stormwater (drainage) easements will not change based on this approval. Lot OS-2 will remain an open space lot and cannot be converted to a house lot without a new development plan application and approval by the Planning Commission to increase the number of allowed lots within the subdivision. If this application is approved as requested, the Lantern Park Subdivision can have up to 25 detached house lots.
Staff are recommending that the mail kiosk for the Lantern Park Subdivision be located along Lantern Park Lane, internal to the subdivision, rather than along Mission Hill Lane. However, this will require approval from the United States Postal Service (USPS). Ultimately, the mail kiosk will be located where the USPS requires it.