Details of Action
−
+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Obtaining a street connection permit from the Tennessee Department of Transportation.
4. The revised driveway access from the entrance road to Lot 2 is subject to approval by the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Certification on the final plat by the applicant's surveyor that there is 400 feet of sight distance at the entrance road in both directions along Tazewell Pike.
7. Placing a note on the final plat that Lot 2 shall have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Property Information
−
+
LocationNorth side of Tazewell Pike at intersection with Clapps Chapel Rd.
Commission District 8
Size2.96 acres
Sector
Currently on the Property
Two single-family residences
Growth PlanRural Area
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerNortheast Knox Utility District
TelephoneMetro Group Bell South Telephone
WaterNortheast Knox Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1-5 because existing site conditions and the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 9 conditions:
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Obtaining a street connection permit from the Tennessee Department of Transportation.
4. The revised driveway access from the entrance road to Lot 2 is subject to approval by the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Certification on the final plat by the applicant's surveyor that there is 400 feet of sight distance at the entrance road in both directions along Tazewell Pike.
7. Placing a note on the final plat that Lot 2 shall have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1-5 because existing site conditions and the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 9 conditions:
Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Obtaining a street connection permit from the Tennessee Department of Transportation.
4. The revised driveway access from the entrance road to Lot 2 is subject to approval by the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Certification on the final plat by the applicant's surveyor that there is 400 feet of sight distance at the entrance road in both directions along Tazewell Pike.
7. Placing a note on the final plat that Lot 2 shall have access only to the internal street system.
8. Meeting all requirements of the approved use on review development plan.
9. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.