Monthly Archive
Planning Commission
August 12, 2021
Postponed to the June, 2021 Planning Commission meeting
Postponed to the June, 2021 Planning Commission meeting
Postponed to the June, 2021 Planning Commission meeting
Approve variances 1-5 because the site conditions restrict compliance with the Subdivision Regulations and the proposed variances will not create a traffic hazard.
Approve the concept plan subject to 8 conditions.
Withdrawn as requested by the applicant on 6/25/2021.
Approve the development plan for up to 27 detached dwelling units on individual lots and the peripheral setback reduction from 35-ft to 25-ft for Pine Grove Road frontage of Lot 27, subject to 1 condition.
Approve the Concept Plan subject to 6 conditions.
WITHDRAW at the request of the applicant.
Approve the One Year Plan amendment to the O (Office) land use classification because of a change in conditions due to the construction of a self-storage facility next door.
Approve the sector plan amendment to O (Office) land use classification because of a change in conditions due to the construction of a self-storage facility next door.
Postponed to the October, 2021 Planning Commission meeting
Postponed to the September, 2021 Planning Commission meeting
Approve O (Office) zoning due to the change of conditions in the construction of a self-storage facility next door.
Postponed to the September, 2021 Planning Commission meeting
Postponed to the November, 2021 Planning Commission meeting
Postponed to the September, 2021 Planning Commission meeting
Postponed to the September, 2021 Planning Commission meeting
Approve the request for a two-family dwelling in the RN-1 zone, subject to 4 conditions.
Postponed to the September, 2021 Planning Commission meeting
Approve RA (Low Density Residential) zoning because it is consistent with the South County Sector Plan and surrounding zoning.
Applicant withdrew the application prior to publication
Approve the proposed site improvements for Calvary Chapel of Knoxville as identified on the development plan, subject to 4 conditions.
Approve the request for an indoor storage building with approximately 9,000 sqft of floor area as an accessory use, subject to 5 conditions.
Approve C-H-2 (Highway Commercial) zoning because it is comparable to the CB (Business and Manufacturing) zone in Knox County.
Approve RR (Rural Residential) & HP (Hillside Protection) because it is consistent with the surrounding development.
Approve the development plan for up to 9 detached dwelling units on individual lots for Unit 2 of the Dorchester subdivision (up to 79 lots total), subject to 1 condition.
Approve RN-1 (Single-Family Residential) zoning because it is comparable to the RA (Low Density Residential) zone in Knox County.
Approve GC (General Commercial) and HP (Hillside Protection) because of changing conditions in the area.
Approve CA (General Business) zoning because it is consistent with the Northwest County Sector Plan.
Approve RA (Low Density Residential) zoning because it is consistent with the North County Sector Plan, and surrounding zoning.
Postponed to the September, 2021 Planning Commission meeting
Approve PR (Planned Residential) zoning with up to 3 du/ac because it is consistent with the Growth Policy Plan and the Northeast County Sector Plan.
Approve I-MU (Industrial-Mixed Use) zoning because it is more compatible with the surrounding area than the existing zoning and will bring the property into conformance with the Central City Sector Plan.
Approve PR (Planned Residential) zoning up to 2 du/ac because it is consistent with the surrounding development.
Approve PR (Planned Residential) zoning with up to 4 du/ac.
Postponed to the October, 2021 Planning Commission meeting
Approve I-MU (Industrial-Mixed Use) zoning because it is a minor extension of that zone and is consistent with the North City Sector Plan?s land use designation.
Approve RN-2 (Single-family residential neighborhood) district & HP (Hillside Protection) Overlay because it is compatible with existing zoning in the area.
Approve CA (General Business) zoning because of changing conditions in the area.
Approve the Concept Plan subject to 6 conditions.
Withdraw at the request of the applicant.